find a SEDA-Distributor

SEDA / Drainage  / GreenPoint / GreenPoint GBDM-Set / 

GreenPoint GBDM-Set

GreenPoint GBDM-Set

Specially designed for small enterprises and customers, SEDA presents his new product line Green Point.

Another product of this new spin off is the well known SEDA-Gear box drilling machine in a brand new Set. This complete set contains high quality products: 

S-52100 SEDA–Gearbox drilling machine turbo

  • incl. suciton hose, Filter and
  • 500 tank closing plugs

GP-40210 GreenPoint pump Type NA-VR

  • incl. connection hose

Product details

Product details

Advantages of GreenPoint Gearbox drilling SET

  • high-quality product
  • best price
  • incl. accessories
  • compact set
  • powerful
  • easy to handleerweiterbar
  • proved and tested

Green Point – powered by SEDA
The new SEDA product line with original, high quality SEDA products for small enterprises.


SEDA´s remarkable Gear box drilling machine drills through gear boxes and sucks out waste oil at a rate of up to 20 liters per minute without spilling a drop. Its robust design and ease of use have made it the Car Dismantlers favorite around the world.

The new Green Point NA-VR pump is specially designed for low cost by maximum efficiency. The pump works perfect with the SEDA-Gear box drilling machine.

Set includes:
1 S-52100 SEDA-Gearbox drilling machine
1 S-50015 Spare rubber sleeve
1 S-50029 Waste oil suction hose
1 S-50006 Sealing plugs (500 pcs.)
1 GP-40210 Green Point gas pump Type NA-V


Optional expansion capability: 

  • GP-56000 Air operated control unit
  • (to activate individual pumps)
  • GP-40221 Pump wall mounting
  • GP-40213 Oiler
  • GP-40214 Air Processing unit (oiler & water separator)


Optional Equipment for your pump will increase the durability of the pump and the Drilling machine!
Water separator with regulator: no more water or dirt at the pump control!
Oiler: increase the lifetime of the Drilling machine!

Art.-No.: GP-40217 GreenPoint Gearbox Drilling SET
SET includes all accessories

Specifications

Specifications

  • Air pressure required: 8 bar
  • Compressed air required: 800 l/min
  • Drill time: 10 bis 15 Sekunden (hängt von den Materialeigenschaften ab)
  • Weight Drill unit: 34 kg
  • Weight petrol pump: 20,5 kg
  • Hose length: 4,6 m